STARTING SYSTEM — STARTER Removal / Installation (ATX) and Performance Inspection
G-36prose procedureATX (automatic transaxle) starter mounting shown.
(ATX)
Parts DiagramFig. fig1

Performance Inspection
Magnetic switch
Disconnect the terminal S wire, and perform the following tests.
Pull-in test
Connect battery positive voltage as shown and verify that the pinion is ejected.
CAUTION
Applying power continuously for more than 10 seconds will damage the starter.
Hold-in test
After completing the pull-in test, disconnect the wire from terminal M (with the pinion left ejected) and verify that the pinion does not return.
