MAIN RELAY / P/S PRESSURE SWITCH / CLUTCH SWITCH
F2-157prose procedureClutch switch applies to M/T models.
CONTROL SYSTEM
MAIN RELAY
Inspection
Operation check
Listen for operational sound of the fuel pump relay while starter operating.
Continuity inspection
Main Relay Continuity inspection
- 1Check continuity between the terminals by using an ohmmeter.

- 2Replace the main relay if necessary.
Main Relay Continuity (B+: Battery positive voltage)
Apply B+
Terminal C-DContinuity
No Apply B+
Terminal C-DNo continuity
P/S PRESSURE SWITCH
Inspection
P/S Pressure Switch Inspection
- 1Disconnect the P/S pressure switch connector.
- 2Start the engine, and check continuity of the switch by using an ohmmeter.

- 3Replace the P/S pressure switch if not as specified.
P/S Pressure Switch Continuity
Turned
ContinuityYes
Straight ahead
ContinuityNo
CLUTCH SWITCH
Inspection
Clutch Switch Inspection
- 1Disconnect the clutch switch connector.
- 2Connect the ohmmeter to the switch.

- 3Check continuity of the switch.
- 4If not as specified, replace the clutch switch.
Clutch Switch Continuity
Depressed
ContinuityYes
Released
ContinuityNo
Replacement
Clutch Switch Replacement
- 1Loosen the nuts and remove the clutch switch.

- 2Install the clutch switch.
- 3Adjust the clutch pedal height. (Refer to section H.)
- 4Tighten the nuts to the specified torque.
| Specification | Value |
|---|---|
| clutch switch nuts | 14 - 17N·m |
clutch switch nuts
14 - 17N·m
