EVAPORATIVE EMISSION CONTROL SYSTEM
F2-129prose procedureCHARCOAL CANISTER
Inspection
- 1Remove the charcoal canister.

- 2Visually check the charcoal canister for damage or crack.
- 3Blow through each port and check that air flows.
TWO-WAY CHECK VALVE
Inspection
- 1Remove the valve.

- 2Check the operation of the valve by using a vacuum pump.
- 3If not as specified, replace the two-way check valve.
Two-way check valve operation
Apply approx. 2.0kPa {1.5 mmHg, 0.6 in Hg} vacuum at port A
ResultAirflow
Apply approx. 5.9kPa {4.4 mmHg, 1.7 in Hg} vacuum at port B
ResultAirflow
CHECK-AND-CUT VALVE
Inspection
- 1Remove the valve and plug port C.

- 2Check operation of the valve by using a vacuum pump.
Check-and-cut valve operation
Apply approx. 1.0-4.90 kPa {7.4-36.7 mmHg, 0.3-1.44 in Hg} vacuum at port A
ResultAirflow
Apply approx. 6.4-8.3 kPa {48-62 mmHg, 1.9-2.4 in Hg} vacuum at port B
ResultAirflow
SEPARATOR
Inspection
- 1Remove the left side trim.

- 2Remove the separator.
- 3Visually check the separator for damage. Replace it if necessary.
