Mazda MX-3 silhouetteMX-3

WINDSHIELD

S-44prose procedure

Windshield Installation note (continued)

  1. 11
    Align the glass marks with the notches in the spacers and install the glass onto the body.
    Front view of the windshield with glass-to-body clearance dimensions 8 (0.31) at top and 450 (17.7) center span; a magnified inset shows the V-notch SPACER aligned with the MARK on the glass. Unit note 'mm (in)'.
  2. 12
    Press firmly on the glass to compress the sealant. Verify that the body-to-glass clearance is as shown.
  3. 13
    Use a scraper to smooth away any sealant that oozes out. Add more sealant to any points of poor contact. Adjust the upper and side sealant as shown, if necessary.
    Cross-section of the glass, dam and repair sealant showing where to adjust the sealant. Labels: GLASS, DAM, REPAIR SEALANT, and 'ADJUST SEALANT IN THIS AREA' with a hatched region indicating the sealant.
  4. 14
    Install the windshield molding before the sealant hardens. (1) Align the marks on the molding to the roof inner line. (2) Install the top of the molding. (3) Install the corners of the molding. (4) Install the sides of the molding, starting from the top and then toward the bottom.
    Front view of the windshield molding installation sequence with circled numbers 1 (top), 2 (sides), 3 (corners), 4 (lower sides) indicating install order, with arrows. Section markers A-A and B-B with their molding cross-section details (SEC. A-A, SEC. B-B) shown at right.
  5. 15
    To prevent the glass from being pushed out by air pressure if a door is closed, open all of the windows until the repair sealant has hardened.
  6. 16
    Check for water leaks. If a leak is found, wipe the water off well and reinstall the windshield.

Hardening time of repair sealant

Hardening time of repair sealant

5°C {41°F}
Surface hardening timeApprox. 1.5 hr
Time required until car can be put into service12 hr
20°C {68°F}
Surface hardening timeApprox. 1 hr
Time required until car can be put into service4 hr
35°C {95°F}
Surface hardening timeApprox. 10 min
Time required until car can be put into service2 hr

Search Manual

Search pages, specs, and procedures