Molding
S-29prose procedureInstallation note — Vertical window molding
- 4Insert the blade of the SST into the sealant, and pull on the bar to cut the sealant near the glass as shown.

- 5Apply primer to the bonding area of the glass, liftgate, and new vertical window molding by using a brush. Use only glass primer on the glass and body primer on the liftgate and molding. Keep the area free of dirt and grease, and do not touch the surface. Allow the primer to dry for approximately 30 minutes.

- 6Apply a 3 mm (0.12 in) bead of repair sealant between the glass and the liftgate.

- 7Remove the protective liner paper of the double-sided adhesive tape of the vertical window molding.
- 8Install the vertical window molding before the sealant hardens. 1) Align the mark of the molding to that on the glass. 2) Starting from the center, press the molding into place toward both ends.

Hardening time of repair sealant
Hardening time of repair sealant
5°C (41°F)
Surface hardening timeApprox. 1.5 hr
Time required until car can be put into service12 hr
20°C (68°F)
Surface hardening timeApprox. 1 hr
Time required until car can be put into service4 hr
35°C (95°F)
Surface hardening timeApprox. 10 min
Time required until car can be put into service2 hr
