DRIVE SHAFT
M-28prose procedureDrive shaft (continued)
- 3After installation, pull the front hub outward to confirm that the drive shaft is securely held by the clip.

- 4Install the lower arm ball joint to the knuckle and tighten the through bolt.

Tie-rod end
- 1Position the tie-rod end and dust boot directly over the knuckle hole.

- 2Install the nut to the tie-rod end and tighten.
- 3Install a new cotter pin.
| Specification | Value |
|---|---|
| Tightening torque (tie-rod end nut) | 43 - 56N·m |
Tightening torque (tie-rod end nut)
43 - 56N·m
Locknut
Install a new locknut and stake it, as shown.
| Specification | Value |
|---|---|
| Tightening torque (locknut) | 236 - 318N·m |
Tightening torque (locknut)
236 - 318N·m
